10/28/09

Kitchen Electric Upgrade, Part 1

The most significant work needs to happen in my kitchen. I need electrical and plumbing upgrades. A friend from my days as an FRC student came up to help me with phase 1 of a very much needed upgrade. This phase:
  1. remove old wiring in the kitchen - 110 and 220
  2. rewire / add wiring to accommodate electric range, new receptacles and lights
Next phase:
  1. upgrade panel to 200 amp service (scheduled for Spring/Summer 2010)
I started by demolishing part of a wall in the kitchen before Mike arrived to expose the existing baffling wire job:


No comments:

Post a Comment

Note: Only a member of this blog may post a comment.